Skip to main content

Wyoming State Penitentiary-Rawlins

 File — Box: 4

Scope and Contents

  1. Boiler House Pre-Functional Test Check Lists, 2005
  2. Completion and Closeout, 2005-2007
  3. Cost Estimates, 2004
  4. Design Clarification - Garment Shop, 2007
  5. Design Issues, 2006
  6. Fire Marshals Plan Review, 2006
  7. Resumption of Construction, 2007
  8. Revisions, 2006
  9. South Facility Cost Estimate Backup, 2004
  10. South Facility Design Development Cost Estimate, 2004
  11. South Facility Design Documents, 2004
  12. South Facility Project Manual, Vol. 1 and 2, 2004
  13. South Industrial Building Completion, 2007
  14. South Industries Building, 2005-2006
  15. South Industries Building Design, 2006
  16. Tindall Corporation, 2006-2007
  17. Warehouse Racking, 2006-2007
  18. Welding Education Issue, 2006

Dates

  • 1980-2007

Language of Materials

From the Collection:

English

Access Restrictions

The collection is open for research though some record types may be restricted. See notes in the container list.

Extent

From the Collection: 345 cubic feet

Creator

Repository Details

Part of the Wyoming State Archives, Wyoming Cultural Resources Division, Wyoming Department of State Parks & Cultural Resources Repository

Contact:
Barrett Building
2301 Central Avenue
Cheyenne Wyoming 82002 United States
(307) 777-7826